Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 46273 REL 32: 2001-003-00 EXP INSTALL/EVAL OF ESTABLISHED PIT TAG TECHNOLOGIES
Project Number:
Title:
Adult PIT Detector Installation
Stage:
Closed
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
46273 REL 32
Contract Title:
2001-003-00 EXP INSTALL/EVAL OF ESTABLISHED PIT TAG TECHNOLOGIES
Contract Continuation:
Previous: Next:
46273 REL 15: 2001-003-00 EXP INSTALL/EVAL OF ESTABLISHED PIT TAG TECHNOLOGIES
  • 46273 REL 51: 2001-003-00 EXP INSTALL/EVAL OF ESTABLISHED PIT TAG TECHNOLOGY
Contract Status:
Closed
Contract Description:
Project 200100300 was started in 2001 in order to fund the installation and evaluation of the PIT-tag systems for adult salmonids. Originally, this was only for orifice-based detection systems in fish ladders, but PIT-tag technologies have developed quickly over the past decade, which has enabled PIT-tag systems with larger and larger antennas to be fabricated. As a result of the technologies evolving, this project has also evolved over time as we recognized the need to assess the impacts of integrating PIT-tag technologies that were not anticipated in 2001. Furthermore, we also now recognize that whenever we adopt a new PIT-tag technology such as a new tag model, it could have a significant impact (positive and negative) on how well the existing PIT-tag systems detect tagged adult and juvenile salmonids. Therefore, we now evaluate the potential impact of adopting new technologies before they are adopted or installed. To reflect the evolution of the project, we changed its title in 2006 to "Installation and Evaluation of Established PIT-tag Technologies."  It is important to point out that the focus of this project is on integrating finished products and not on developing new ones.  

Within this project, PSMFC is responsible for installing the systems, and NMFS is responsible for evaluating the installed systems.  Because the agencies have different responsibilities, they work together to evaluate the potential impact of adopting alternative technologies to the already established monitoring system that the entire fisheries community relies on for collecting data on salmonids.  PSMFC's responsibility is related to operations and maintenance, and NOAA's responsibility is to ensure that a technology is appropriate for fisheries applications and that the new technologies perform as advertised.  By working together, we ensures that a technology is ready for operations when it is adopted or installed.

During the performance period (12/1/2011-11/30/2012), this project will provide funds to NMFS for its

1) Administrative tasks associated with this project
2) Annual evaluation of interrogation systems for adult salmonids using in-river fish
3) Evaluation of new transceiver for replacing the current series of transceivers
4) Evaluation of the new 9-mm PIT tags with a fish test at a juvenile fish bypass system
5)  Annual reports for previous years
6) Assistance in the development and evaluation of the new separation-by-code software


Since all of the projects in the mainstem research/monitoring group rely to a large extent, or almost exclusively, on information gathered from PIT-tagged fish, their success are dependent on the successful implementation of this project and two other projects (199008000, 198331900) that provide the fundamental structure for the network of PIT-tag systems. The evaluations of the technologies provided by this project are critical because they determine the accuracy of the data that will be collected by future users.
Account Type(s):
Expense
Contract Start Date:
12/01/2011
Contract End Date:
11/30/2012
Current Contract Value:
$232,759
Expenditures:
$232,759

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Funding Package - Submit draft to COTR B: 119. Administration tasks for this project 08/01/2012 09/14/2012
Environmental compliance documentation C: 165. NEPA, ESA, & Section 106 NHPA review of Work elements that require EC 04/09/2012
Data from the evaluation of the network of interrogation systems for adult salmonids D: 162. Evaluate performance of the entire network of adult interrogation systems 11/30/2012 11/16/2012
Tagged fish E: 158. Tag fish for evaluating the new ogee transceiver with the corner-collector system 07/01/2012
Data collected from the evaluation of the new ogee transceiver with the corner-collector system F: 157. Conduct fish tests on the new ogee transceiver with the corner-collector system 07/01/2012
Section in PSMFC progress report G: 156. Assist in development and evaluation of new separation-by-code software 08/31/2012 10/19/2012
Data from the evaluation of the prototype transceiver H: 157. Evaluation of a new transceiver model for replacing the current series of transceivers 11/30/2012 11/30/2012
Tagged fish I: 158. Tag fish for evaluation of the new separation-by-code software (M4) 07/01/2012 04/03/2012
Data collected from the evaluation of the M4 separation-by-code software J: 157. Conduct fish tests on the new separation-by-code software (M4), 2020 transceiver, and tags 07/30/2012 04/06/2012
Analysis of the data collected from the fish tests conducted in 2012 K: 162. Analyze the results from the fish tests used to evaluate the different PIT-tag technologies 09/30/2012 09/28/2012
Report on coordination efforts L: 156. Help design adult system for either The Dalles or John Day Dam 11/30/2012
Design plans from the Corps M: 156. Design ogee-based PIT-tag system for Lower Granite Dam 11/30/2012
Attach Progress Report in Pisces N: 132. Submit Progress Report for the period (Dec 2010) to (Nov 2011) 08/15/2012 09/15/2011
Attach Progress Report in Pisces O: 132. Submit Progress Report for the period (Dec 2009) to (Nov 2010) 07/30/2012

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 158 Mark/Tag Animals
  • 2 instances of WE 162 Analyze/Interpret Data
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 162 Analyze/Interpret Data
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 162 Analyze/Interpret Data
Sockeye (Oncorhynchus nerka) - All Populations
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (Oncorhynchus mykiss) - All Populations
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 158 Mark/Tag Animals
  • 2 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 12/01/2011
B 119 Administration tasks for this project 12/01/2011
C 165 NEPA, ESA, & Section 106 NHPA review of Work elements that require EC 12/01/2011
D 162 Evaluate performance of the entire network of adult interrogation systems 12/01/2011
E 158 Tag fish for evaluating the new ogee transceiver with the corner-collector system 12/01/2011
F 157 Conduct fish tests on the new ogee transceiver with the corner-collector system 12/01/2011
G 156 Assist in development and evaluation of new separation-by-code software 12/01/2011
H 157 Evaluation of a new transceiver model for replacing the current series of transceivers 12/01/2011
I 158 Tag fish for evaluation of the new separation-by-code software (M4) 12/01/2011
J 157 Conduct fish tests on the new separation-by-code software (M4), 2020 transceiver, and tags 12/01/2011
K 162 Analyze the results from the fish tests used to evaluate the different PIT-tag technologies 12/01/2011
L 156 Help design adult system for either The Dalles or John Day Dam 12/01/2011
M 156 Design ogee-based PIT-tag system for Lower Granite Dam 12/01/2011
N 132 Submit Progress Report for the period (Dec 2010) to (Nov 2011) 12/01/2011
O 132 Submit Progress Report for the period (Dec 2009) to (Nov 2010) 12/01/2011